1
/
of
26
Kurvas
Kurvas PJ501
Kurvas PJ501
This post-surgery pajama combines an excellent design that provides style, comfort, and privacy just right after leaving the OR. You will be pleased once you see all the amazing features of this surgical robe.
- Made of peach skin fabrics that will keep the skin fresh.
- 4 inner pockets to carry drains or pain pumps.
- Perfect for after surgical procedures such as mastectomy, liposuction, and tummy tuck.
- Ideal design so you can wear your compression faja under it.
- Resistant to tension and tearing.
- Maintains its shapes for a long time
- ¾ sleeve length that eases the IV access.
- Available colors: dark red, black, and dark blue.
- Satin collar and cuffs.
- Adjustable satin belt
Regular price
$48.99 USD
Regular price
Sale price
$48.99 USD
Quantity
Couldn't load pickup availability
Share
